Autoplay
Autocomplete
Previous Lesson
Complete and Continue
Custom Tiled Walk-in Shower Course
Welcome 😊
Introduction (1:07)
Demo
Demo (4:20)
Fiberglass Pan Removal (4:53)
Plumbing & Framing
Moving shower drain (12:11)
Subflooring (3:28)
Wall Framing (12:37)
Rough-in Valve Installation (15:43)
Waterproofing - WEDI shower system
Drain preparation (0:56)
Cutting Pan to size (5:52)
Drain connection & Setting of pan (7:13)
Installing WEDI Panels (16:08)
Additional waterproofing (4:34)
Flood Testing (3:44)
Tiling
Thinsets, trowels, mixing (4:11)
Tiling Sequence (6:19)
Tiling Shower pan (21:54)
Back wall of shower (16:24)
Tiling side wall (6:07)
Tile Plumbing wall (8:28)
Tile Curb (3:18)
Recessed niche (3:40)
Grouting
Sealing stone (3:05)
Grouting border & floor with different color (5:37)
Epoxy grout - White (8:57)
Shower Faucet Trim
Handheld Shower Port Attachment (2:39)
Diverter Valve Trim (1:45)
Shower Valve/Head/Temperature Adjustment (6:28)
Handheld Slide Rail (3:22)
Glass Enclosure
Online Shower Kits & Handling Glass (3:17)
Mounting Door (9:12)
Fixed Panel (14:35)
Door seals & Silicone (7:08)
Thank you 😊
Conclusion (1:04)
Teach online with
Introduction
Lesson content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock