Autoplay
Autocomplete
Previous Lesson
Complete and Continue
Tub/shower bathroom remodel in 7 days or less
Introduction & Preparation
Intoduction (17:59)
Preparation - check lists & basic layout recommendations (2:08)
Which Browser Should I Use? Videos not playing - Trouble Logging in
Day 1
Intro - Goals for the Day (4:01)
Toilet Removal (1:55)
Vanity Removal (2:29)
Tub Drain & Faucet Removal (3:16)
Ceramic Tub Surround & Steel Tub Removal (5:14)
Drywall Removal & Electrical (temporary lighting) (11:00)
Vent Fan Install (7:23)
Insulation (2:25)
Light above shower - running wire (1:17)
Hanging Drywall - Ceiling (2:56)
Linoleum or Tile Floor Removal - Last task of Day 1 👍 (2:02)
Day 2
Intro - Goals for today 🛁 (3:23)
Subfloor & Tub Drain Prep (3:53)
Tub & Drain Assembly (7:25)
Tub Installation (10:12)
Tub and Shower Faucet Install (21:48)
Sink Drain - moving (3:26)
GFI outlet - new wire & box (1:49)
Day 3
Goals for the Day (2:23)
Framing, Blocking, and Overcoming Tub Flange (8:04)
Drywall hanging (6:42)
Drywall Finishing 1st Coat (6:33)
Framing a Corner Niche (1:44)
Waterproofing Tub Surround - GO Board (14:38)
Drywall to Go Board Seam (1:56)
Day 4
Goals of the Day (1:47)
Schluter Ditra Tile Floor Underlayment (14:55)
Thinsets & Tile Layout (4:52)
Setting Tile - Back Wall (14:54)
Setting Tile - Side Wall (4:52)
Drywall Finishing - 2nd Coat (6:13)
Tile Floor Layout & Prep (8:03)
Mosaic Border - Prep (4:42)
Day 5
Goals for the Day (0:21)
Shower Niche Tile (10:43)
Setting Mosaic Border & Finishing Tub Surround (2:30)
Drywall Finishing - 3rd Coat (3:50)
Tile Floor (6:59)
Day 6
Goals for the Day (2:58)
Drywall Finishing - Final Coat (0:56)
Cleaning Tile & Preparing for Grout (4:20)
Epoxy Grout Mixing (12:08)
Epoxy Grout Application (6:45)
Epoxy Grout Cleaning (8:56)
Priming & Caulking (3:35)
Shower Faucet Trim (8:39)
Painting (2:38)
Caulking Tub & Corners of Surround (4:12)
Grouting Floor (3:46)
Day 7 🏁🏁
Goals for the Day (2:31)
Electrical - Switches, GFI, Breaker (9:16)
Vanity (12:47)
Light Fixture & Mirror (5:43)
Toilet 🚽 (6:36)
Accessories (5:28)
Carpet Transition (2:16)
Bonus: American Standard Studio Tub Installation
Dryfitting & Evaluation (5:29)
Setting Ledger Boards (6:31)
Drain Assembly (9:26)
Tub Setting (mortar) (5:17)
Trap & Water Test (5:55)
Teach online with
Epoxy Grout Mixing
Lesson content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock